<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=380018&amp;fmt=gif">
_Success_icon About us
_Collaboration_icon Join us
Technical consultation and sales

Contact Us

    Successful SAP Solution Manager Virtualization

    Within a total of six days time, the syslink staff has virtualized the SAP Solution Manager environment of Selfcare Solutions supplier Ypsomed.

    The development and the production system have been moved from a physical host with Windows Server 2003 to a VMware-based installation with Windows Server 2012 using the SAP Software Provisioning Manager. Additionally, the team has updated the Oracle databases from version 10 to 11. All tasks have been fulfilled successfully in time and in budget.